Procter & Gamble Nigeria is the largest FMCG (Fast Moving Consumer
Goods) company in the world with strong brands like Pampers, Ariel,
Always, Gillette, Oral B just to name a few. We have been in existence
for over 176 years globally and 21 years in Nigeria.
PROCESS ENGINEER - AGBARA PLANT
Ref No: MFG00005456
Location: Agbara
Schedule: Full-time
JOB DESCRIPTION
Product
Supply Manufacturing is responsible for every aspect of product making
and is recognized as an industry leader for the development of
innovative production systems and technologies.
Manufacturing has
far-reaching responsibilities which cover reliability, quality, safety
of our equipment / processes and the motivation of the people working in
the plant.
You will be integrated into a multi-functional team from
your very first day on the job and work on your very own project part. A
mentor, a manager with technical mastery in your field of activity,
will give you the best assistance, guiding you through your period of
practical training with experience and advice. You might also attend
courses and training sessions depending on your assignment.
P&G
looks for top university candidates in the engineering field. In
addition to technical excellence, we also search for skills like
communication, initiative, leadership, the ability to work effectively
with others, creativity, innovation and good knowledge of the English
language.
In summary, P&G is looking for high potential recent
graduates (2 years max) who have the strong desire to move things ahead
in a fast moving consumer goods environment to be located at our Agbara
Plant in Ogun State.
RESPONSIBILITIES
The successful candidate will be responsible for the below:
Technical Documentation:
Acquire and understand full set of up-to-date mechanical drawings, electrical and pneumatic drawings
Acquire complete software package (Vendor and P&G specific)
Establish effective storage and maintenance process for those
Midrange:
Acquire full set of mechanical, electrical, pneumatic settings for your equipment
Understand the meaning and influence of all of those
Verify personally the reliability of measurements methods and tools
Develop a list of selected parameters to be tracked and checked via CPE or PA as well as proper drawings and formats
Develop initial targets and limits for those.
Major Spares:
Understand the initial list of major spares defined within the project scope in your area
Verify whether the initial list is adequate or not and if needed highlight the need for additional ones
Based on the knowledge from other plants understand the lifetime for those
Develop or acquire the replacement and rebuild CBAs’ and train few experts on those
Spare Parts:
Verify initial list of spare parts in your area, add more if needed based on experience
Ensure orders of all spares are placed at least 3months to start-up and assign resources to track delivery
Develop from day one, very rigorous monitoring / follow-up tool for ordered spares
Maintenance Program:
Based
on information from equipment manufacturer and other plants, develop
maintenance program for critical units and sub-assemblies (time based
and condition based).
Lead your area technicians to develop CIL for each equipment in their area
Define and order proper tools (workshop tools, oscilloscopes, special diagnostic tools, etc.) and test stands
Schedule and execute specific rebuild training for matrix rebuild Technicians
CBA’s & SOP’s:
Develop list of critical CBA’s and SOP to be prepared before start-up
Prepare the CBA’s and SOP’s and verify them to be ready to use before start-up
Changeovers:
Understand in details scope and procedure of changeover for your units
Schedule and get trained on the c/o procedure
Develop written procedures for each c/o item
QUALIFICATIONS
B.Eng/B.Tech in the field of Mechanical or Electrical/Electronic Engineering required
Computer literacy
CLICK HERE TO APPLY
Procter & Gamble Nigeria Graduate Process Vacancy
Like This Post? Please share!
0 comments:
Post a Comment